TurnkeeyConsulting Inspection LLC QC health check

Our lead service

Industrial QC program health check

An independent professional review, within the agreed scope, of how your quality program is written, recorded and, when scoped on site, carried out. You receive a plain-language report of what the reviewed evidence supports, where the gaps are and suggested priorities for your decision.

Request a QC program health check

When it helps

  • Before an owner or third-party audit of your quality program.
  • When a contractor or fabricator is being qualified for a project.
  • When a project is starting and the program has not been tested.
  • When rework keeps appearing and no one can say where the steps are falling through.
  • After a change of QC staff or leadership.

What we look at

  • Procedures and their current revisions, and whether the records follow them.
  • Inspection and test records, including whether they show what was actually checked.
  • Weld, material and NDE records, calibration records and personnel qualification records.
  • How responsibilities are assigned and handed off between owner, contractor, vendor and QC.
  • When scoped on site: defined observations of work in progress, stated in writing.

How it works

  1. Scope. A short conversation about your project, milestone and what worries you.
  2. Agreement. We agree the scope and fee with you in writing before any work starts or any documents are shared.
  3. Review. We review the records and procedures you supply and talk with your team. On-site observation is added when you want it.
  4. Report. You receive a plain-language report: what the reviewed evidence supports, each gap with its source, and suggested priorities for your decision.
  5. Follow-up. Optionally, we recheck updated records or defined work after you respond.

On site or remote

Remote is for projects that prefer no one on site, or work that does not need it. A remote review covers the records and the program. It does not assess field execution and carries no stop-work authority.

On site, we make defined observations and state in writing what we examined or witnessed. On-site observations are limited to the agreed scope. They are not continuous inspection, engineering approval, certification or acceptance.

What it is not

Our findings are limited to the agreed scope and the evidence we examine. We do not guarantee schedule, cost, payment or acceptance.

Common questions

How long does a health check take?

It depends on the scope and the records available. We confirm the timeline in writing before work starts.

What do I send first?

A short description of the project, your milestone, whether you prefer on site or remote, and what worries you most. Documents come after we agree a secure transfer method and confidentiality terms.

Start with a QC program health check.

Tell us the project, what worries you and whether you want someone on site or prefer remote. We aim to reply within one business day and agree the scope and fee in writing before any work starts or any documents are shared.

Request a QC program health check